Profitability

Profitability

Fantastic Fast Track…

It is fantastic to share with you that a record tonnage was done through the Fast Track system at Dove Hole quarry…. with over 77kt – equating to 3,500 loads – which represents 40% of the total tonnage across the weighbridge in June!!

What a great team effort by Sharon Lomas, Robert Brian and Neil Adams.